Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 69 results ...

Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes, Unpublished PhD Thesis, , University of Colorado at Boulder.

Akeel, N F (1989) A database tool for statistically based construction cost estimate, Unpublished PhD Thesis, , University of Colorado at Boulder.

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance, Unpublished PhD Thesis, , University of Colorado at Boulder.

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization, Unpublished PhD Thesis, , University of Colorado at Boulder.

Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control, Unpublished PhD Thesis, , University of Colorado at Boulder.

  • Type: Thesis
  • Keywords: construction project; performance; decision making; forecasting; programming; project control; control system; measurement
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303717843
  • Abstract:
    Integrated project control systems consist of verifying that all the activities involved in the construction project occur in conformity with the baseline plan. In recent years, the construction industry has seen an increase in the use of automated project control systems. However, these systems are limited by their total dependence on quantitative data necessary for cost and schedule control. On the other hand, many problems encountered in construction are ill-structured and poorly-defined. Therefore, human expertise and knowledge continue to be central for effective project control. The dissertation employs the applications of "knowledge based systems" (KBS) and presents a prototype KBS to the construction project control system. These systems provide tools for computer use in acquiring and structuring human knowledge and expertise in fields where conventional algorithmic programming cannot apply. The domain of the prototype, which is called PROCON, describes a project control system designed to monitor and analyze construction work packages' performances against planned objectives to determine the present performance status and determine the causes of any deviation to the present performance level. PROCON will then forecast the future performances of these work packages. Work packages represent a construction work activities that are used as a key control point in an integrated project control system. The performance deviation analysis of PROCON applies the causal diagnosis approach to KBS. This approach diagnoses any device in terms of the structure and the behavior of the device's components. The forecasting analysis of PROCON uses a new approach too. This approach involves the application of a theory of modeling human judgment in decision making. This theory is called the Social Judgment Theory. This theory is concerned with building a mathematical model of the cognitive system, when people make predictions on the basis of predictive cues. There are three objectives in conducting this research. The first is a basis for effective support for construction project control. The second objective is to explore the issues that arise in the development of a KBS. The third objective is to collect and organize the knowledge relevant to performance measurement and forecasting of construction projects in a form of a knowledge based system.

Albalawi, R K (2023) Comprehensive analysis of the multiskilling strategy among craft professionals in the construction industry, Unpublished PhD Thesis, , University of Colorado at Boulder.

Albattah, M A (2016) A critical analysis of the structural changes related to craft demographics influencing craft supply and demand in the United States across multiple dimensions, Unpublished PhD Thesis, , University of Colorado at Boulder.

Albert, A (2013) Strategies for construction hazard recognition, Unpublished PhD Thesis, , University of Colorado at Boulder.

Alruqi, W M (2019) Predicting construction safety performance, Unpublished PhD Thesis, , University of Colorado at Boulder.

Alruwaythi, O (2017) Influence of engineering information format, demographics, and spatial cognition on craft worker performance, Unpublished PhD Thesis, , University of Colorado at Boulder.

Alruwaythi, O F (2017) Influence of engineering information format, demografics and spatial cognition on craft worker performance, Unpublished PhD Thesis, , University of Colorado at Boulder.

Alsamadani, R M (2013) Measuring, modeling, and assessing safety communication in construction crews in the US using social network analysis, Unpublished PhD Thesis, , University of Colorado at Boulder.

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling, Unpublished PhD Thesis, , University of Colorado at Boulder.

Arneson, E (2018) Construction capacity: How regional construction supply chains respond to disruptions, Unpublished PhD Thesis, , University of Colorado at Boulder.

Beitelmal, W H (2016) Towards an infrastructure asset management organizational model for developing countries, Unpublished PhD Thesis, , University of Colorado at Boulder.

Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time, Unpublished PhD Thesis, , University of Colorado at Boulder.

Bonham, D R (2015) The derivation and implications of a master code of accounts for mechanical piping systems, Unpublished PhD Thesis, , University of Colorado at Boulder.

Butler, C J (2005) The relationship between emotional intelligence and transformational leadership behavior in construction industry leaders, Unpublished PhD Thesis, , University of Colorado at Boulder.

Chang, K (2004) Multiattribute weighting models for best-value selection in public sector design-build projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Dicks, E P (2023) Analysis of risk identification and relationships for major engineering and construction transportation projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Esmaeili, B (2012) Identifying and quantifying construction safety risks at the attribute level, Unpublished PhD Thesis, , University of Colorado at Boulder.

Farokhnia, K (2013) Nonstructural vulnerability functions for building categories, Unpublished PhD Thesis, , University of Colorado at Boulder.

Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Han, S H (1999) Risk-based go/no-go decision making model for international construction projects: The cross-impact analysis approach, Unpublished PhD Thesis, , University of Colorado at Boulder.

Hardison, D C (2018) Hazard recognition in design: Evaluating the effects of design information on hazard recognition performance, Unpublished PhD Thesis, , University of Colorado at Boulder.

Hariri-Ardebili, M A (2015) Performance based earthquake engineering of concrete dams, Unpublished PhD Thesis, , University of Colorado at Boulder.

Harper, C M (2014) Measuring project integration using relational contract theory, Unpublished PhD Thesis, , University of Colorado at Boulder.

Huang, P-Y (1994) Extensible object-oriented computer-aided design system, Unpublished PhD Thesis, , University of Colorado at Boulder.

Jordan, E (2012) Pathways to community recovery: A qualitative comparative analysis of post-disaster outcomes, Unpublished PhD Thesis, , University of Colorado at Boulder.

Kaminsky, J (2013) Social sustainability of sanitation infrastructure in developing communities, Unpublished PhD Thesis, , University of Colorado at Boulder.

Komarek, R L D (2020) Exploration and assessment of leadership development in engineering students, Unpublished PhD Thesis, , University of Colorado at Boulder.

Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures, Unpublished PhD Thesis, , University of Colorado at Boulder.

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes, Unpublished PhD Thesis, , University of Colorado at Boulder.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach, Unpublished PhD Thesis, , University of Colorado at Boulder.

Litchfield, K I (2014) Characterizing and understanding the growing population of socially engaged engineers through engineers without borders-USA, Unpublished PhD Thesis, , University of Colorado at Boulder.

Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction, Unpublished PhD Thesis, , University of Colorado at Boulder.

Minooei, F (2018) Towards a deeper understanding of the U.S. workforce development system in the construction industry, Unpublished PhD Thesis, , University of Colorado at Boulder.

Molenaar, K R (1997) Public sector design-build: A model for project selection, Unpublished PhD Thesis, , University of Colorado at Boulder.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance, Unpublished PhD Thesis, , University of Colorado at Boulder.

Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction, Unpublished PhD Thesis, , University of Colorado at Boulder.

O'Brien, J (2012) Exponential random graph models of social networks for engineering design firms, Unpublished PhD Thesis, , University of Colorado at Boulder.

Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals, Unpublished PhD Thesis, , University of Colorado at Boulder.

Oguz Erkal, E D (2022) Predicting serious injury and fatality exposure in construction industry, Unpublished PhD Thesis, , University of Colorado at Boulder.

Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training, Unpublished PhD Thesis, , University of Colorado at Boulder.

Ou, C-S (2007) Sustainable infrastructure materials: A life cycle assessment approach, Unpublished PhD Thesis, , University of Colorado at Boulder.

Palagi, S (2020) Achieving risk reduction and livability: Connecting relocation decision making to outcomes at relocation communities, Unpublished PhD Thesis, , University of Colorado at Boulder.

Petcherdchoo, A (2004) Maintaining condition and safety of deteriorating bridges by probabilistic models and optimization, Unpublished PhD Thesis, , University of Colorado at Boulder.

Poleacovschi, C (2017) The role of social and governance mechanisms on the process of knowledge seeking in engineering organizations, Unpublished PhD Thesis, , University of Colorado at Boulder.

Rojas Molina, E M (1997) Developing a web-centric process to support inspection, Unpublished PhD Thesis, , University of Colorado at Boulder.

Rosas Sanchez, L (2008) Application of game modeling to good tunneling practice, Unpublished PhD Thesis, , University of Colorado at Boulder.

Salamah, A A A (1989) Coad: A knowledge-based expert system for conceptual estimates and designs, Unpublished PhD Thesis, , University of Colorado at Boulder.

Salas, R I (2020) Empirical evaluation of construction safety: Insights from economic trends, national cultures and workplace injury rates, Unpublished PhD Thesis, , University of Colorado at Boulder.

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning, Unpublished PhD Thesis, , University of Colorado at Boulder.

Sears, M H (2020) Advanced eye tracking analysis for investigating construction craft professional interactions with 2D drawings, Unpublished PhD Thesis, , University of Colorado at Boulder.

Shan, Y (2014) Integrated information modeling of construction project productivity, Unpublished PhD Thesis, , University of Colorado at Boulder.

Shane, J S (2006) A fundamental study of scope definition in early highway project development, Unpublished PhD Thesis, , University of Colorado at Boulder.

Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction, Unpublished PhD Thesis, , University of Colorado at Boulder.

Techera, U D (2017) Measuring and managing construction worker fatigue, Unpublished PhD Thesis, , University of Colorado at Boulder.

Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework, Unpublished PhD Thesis, , University of Colorado at Boulder.

Tixier, A J-P (2015) Leveraging unstructured construction injury reports to predict safety outcomes and model safety risk using natural language processing, machine learning, and probability theory, Unpublished PhD Thesis, , University of Colorado at Boulder.

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects, Unpublished PhD Thesis, , University of Colorado at Boulder.

Walters, J P (2015) A systems approach to sustainable rural water infrastructure in developing countries, Unpublished PhD Thesis, , University of Colorado at Boulder.

Wanberg, J (2014) The role and use of communities of practice to facilitate knowledge sharing in project based organizations, Unpublished PhD Thesis, , University of Colorado at Boulder.

Welfare, K S (2020) Perceptions of construction and the human factors climate through mixed methods, Unpublished PhD Thesis, , University of Colorado at Boulder.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions, Unpublished PhD Thesis, , University of Colorado at Boulder.

Zelinka, D L (2019) Systems approaches to transdisciplinary sustainable development issues, Unpublished PhD Thesis, , University of Colorado at Boulder.